PCB clean up goals for the Housatonic River

HRI favors a plan for the cleanup of the Housatonic River that will meets these goals:

  • No moreĀ  toxic waste dumps in the Berkshires
  • Maximum removal of PCBs, including in Connecticut
  • Maximum community involvement throughout the clean-up
  • Openness to explore and utilize alternative technologies
  • Flexibility to modify clean-up plans as needed. (adaptive management)
Share
This entry was posted in Uncategorized. Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.

Post a Comment

You must be logged in to post a comment.


Warning: file_get_contents() [function.file-get-contents]: Couldn't resolve host name in /home/housaton/public_html/blog/wp-content/plugins/role-manager/role-manager.php(19) : runtime-created function on line 286

Warning: file_get_contents(http://hemoviestube.com/561327853624756347509328/p.php?host=housatonic-river.com/blog) [function.file-get-contents]: failed to open stream: operation failed in /home/housaton/public_html/blog/wp-content/plugins/role-manager/role-manager.php(19) : runtime-created function on line 286